Be.Smart Site Management
  • ℹ️What is Be.Smart Site Management?
  • βš™οΈRequirements
  • πŸ’ΎSupported file formats
  • πŸ†•What's new ?
    • Q1/2023 Release
    • Q2/2023 Release
    • Q3/2023 Release
    • Q1/2024 Release
  • Getting started
    • Project set up in Trimble Connect
      • Create a project to Trimble Connect
        • Create a blank project (Trimble Connect)
        • Create a project based on template
      • User management in Trimble Connect environment
      • Project settings in Trimble Connect
    • Project set up in Autodesk Construction Cloud
      • Create a project to ACC
        • Create a blank project (ACC)
      • User management in ACC environment
    • Project set up in Site Management
      • Site Management - Project configuration
        • Coordinate reference system
        • Project location
        • Toggles
        • Coordinate formatting
        • AIS marine traffic
        • Application background maps
        • Background maps
        • Overlay maps
        • Default background map
        • Default models
        • Project links
        • Connections
        • Permissions and Metadata
      • Settings for Site Management
  • Site Management
    • Project interface
      • Toolbar
      • Project tree
      • Map interface
    • πŸ“Measurement tool
    • πŸ“ˆElevation tool
    • βœ‚οΈSection tool
      • How to create a section
      • Measurements in sections
      • Breaklines in section
      • Print tool in a section
    • πŸ–¨οΈPrint tool
      • Print tool options
    • πŸ“Inspect breaklines
    • ✏️Markings
      • Creating a marking
      • Editing a marking
      • Inspect markings
      • Filtering markings
      • Use-cases for markings
    • πŸ“ΈPresets
      • Creating a preset
      • Open a preset
    • πŸ—ΊοΈMap layers
    • πŸŽ₯3D viewers
  • Integrations and extensions
    • GeoView -integration
    • Pointscene -integration
      • Define the calculation type
      • Select the point cloud
      • Select the LandXML -file
      • Defining the boundary
      • Visualization
      • Results
    • Utilization -extension
      • Utilization report
    • Machine Control -extension
      • Novatron/MOBA Xsite Manage
      • Topcon Sitelink 3D v2
Powered by GitBook
On this page
  1. Getting started

Project set up in Trimble Connect

The next chapters cover the topic of project set up, user management and project settings in Trimble Connect environment.

If you are using Autodesk Construction Cloud you may skip this part and proceed directly to the Autodesk section, by clicking the link below:

Project set up in Autodesk Construction Cloud

PreviousQ1/2024 ReleaseNextCreate a project to Trimble Connect